| BIM Use | Description | Priority (High/Med/Low) |
Lifecycle Phase | |||
|---|---|---|---|---|---|---|
| Plan | Dsgn | Cnst | Oper | |||
| Existing Conditions Modeling | ||||||
| Programming | ||||||
| Site Analysis | ||||||
| Design Authoring | ||||||
| Design Reviews | ||||||
| 3D Coordination | ||||||
| Structural Analysis | ||||||
| Lighting Analysis | ||||||
| Energy Analysis | ||||||
| Engineering Analysis | ||||||
| Sustainability Evaluation | ||||||
| VR Design Validation | ||||||
| Code Validation | ||||||
| Site Utilization Planning | ||||||
| Construction System Design | ||||||
| Digital Fabrication | ||||||
| 4D Phase Planning | ||||||
| 5D Cost Estimation | ||||||
| Building Maintenance Scheduling | ||||||
| Building System Analysis | ||||||
| Asset Management | ||||||
| Space Management / Tracking | ||||||
| Disaster Planning | ||||||
| Record Modeling | ||||||